Monday, September 22, 2008

More Dome Work



I found some time last night to continue working on the dome. I'm about 90% done with the cutting and *hopefully* I'll be able to get this painted before the weather turns bad. I also started putting some parts together for the A&A frame. This is the rear door, front utility arm carrier, and internal trays.


2 comments:

Calvin Thomas said...

Are you going to out the frame together without glueing?
This is what I did and I was glad because I changed alot of things later in the build.
What tpye of legs are you planning to use?
Good luck with your build, I'm still at it after 3 years.
Calvin

jduffphoto said...

Hey Calvin, thanks for the comments. I sent you an off board email to answer your questions, but the short and long of it... I'm planning on Andy's A&A legs to go with his frame.

I did have to glue some of the frame together, but I limited as much as possible. My design is to keep Artoo as a permenant 3 foot position, as this is my first build. If I feel the need to modify, I may pick up a second frame, but that is long down the road.
- Jon