I was able to get some work done while on vacation during the holidays. The first outer leg is completed as far as I'm going to take it at this time. This is fully painted and awaiting the final details. I am waiting to test it under stress prior to adding the shoulder horse shoe layers and resin booster cover. All parts test fit perfectly.

I started work on the other outer ankle as well as skinning the 2nd outer leg. I also ordered my motor controller from Robotshop.com. This is the Dimension Engineering Sabertooth 2x25 controller that will operate the motors in the two feet. (the picture is from Robotshop.com).

Last night, I strung another series of LEDs together for the front logics. Three more to go and that will be complete.








Friday, December 25, 2009

Christmas 2009


Merry Christmas and God's richest blessings to friends and family for the new year to come!! All the time, He is good!!!

Jon

Wednesday, December 23, 2009

First leg ready for primer.

The construction of the first ankle is complete. I made the ankle and bracelet to be one piece and as you can see, in the picture, I had to fill in the area where the two pieces came together. I had a small gap in there that I didn't like and the filler worked out very well, not only filling the space, but also to make the bond stronger. I will have to mask off the bracelet as it will be metallic, while the rest of the ankle is white. I plan on having this primed tonight and ready for paint tomorrow.

The booster again, is just set in place for the picture. I have been looking at other builders blogs to see how they have attached the booster on their droids. I still haven't decided which way I would like to do this and may hold off until I fully test the legs on the droid when it eventually gets moving. I'm on vacation between Christmas and New Years Eve, so I plan on spending some time working on finishing up this leg, and starting the other outer ankle. I'm hoping to have Artoo standing before too long.






Tuesday, December 15, 2009

Leg and Ankle update

This month marks my second year as a member of the R2 Builders Club. Two years into this project and I've come this far. Can't wait to see what next year brings!!

Not too much of an update as I have been busy with family and work, but a little work here and there over the last few weeks gave me enough to add to the blog.

I finally got around to finishing off the construction of the first of two outer ankles. I've had this part sitting about 2/3's complete since August. This like the legs are based on Dave's styrene plans, with a very slight modification to add more bracing.

I ran into a small issue with the booster and ankles. I created the curved section for the ankle and didn't take into consideration that I needed to recess the booster into this part, as I had cut the ankle to allow for the booster to fit properly. You can see that the cut notch on the legs and the booster did not match up in the first two pictures unless the curved part was slid down the ankle by 1/4". After a little thinking, I recreated that curved section and pre-cut an access into the top face and the center brace (not shown). After letting it sit and dry, the booster fits perfectly, and the notches line up on the leg and booster parts. I'm still cutting the ankle bracelet piece and will pre-paint that part aluminum. I will have to smooth out the edges of the ankle and then skin them with a layer of .040 styrene to give them the same finished appearance as the legs.